Overview
We review only the architectural millwork package for buildability, code compliance and coordination gaps before you go out to bid. Our team has hands-on millwork shop experience, so we catch the details general contractors miss — veneer sequence breaks at inside corners, hardware conflicts in tight casework, solid-surface seam locations that fall on high-wear edges, blocking and rough-in requirements for feature walls, and ADA/AODA reach ranges on reception desks. The gallery shows real examples of millwork constructability review: redlined shop drawings, 3D clash detection, field-ready detail markups and the coordination-gap register we deliver.
Best for
- Pre-tender millwork package review
- Design-build teams with heavy millwork scope
- Complex healthcare / hospitality millwork
- Heritage and feature-millwork coordination
Process — award to install
01 · Estimating
Take-off from your drawings, specs and finish schedule. Line-item quote returned within one business day for most packages.
02 · Engineering & Shop Drawings
In-house team produces AWI/AWMAC-compliant shop drawings in AutoCAD, coordinated with Microvellum for direct-to-machine output.
03 · Submittals & Samples
Finish samples, hardware cut-sheets and drawing set submitted for architect/GC approval prior to release to production.
04 · CNC Fabrication
Panels nested and machined on multi-axis CNC. Solid-wood machining, edge-banding and dowel/confirmat assembly in dedicated cells.
05 · Finishing
Controlled-environment spray booths for stain, lacquer, conversion varnish, catalyzed polyurethane and low-VOC waterborne systems.
06 · QC & Pre-Ship
100 % dimensional and finish inspection against the approved shop drawings. Pre-assembled where practical for site-fit certainty.
07 · Delivery & Install Coordination
Blanket-wrapped, phased delivery coordinated with your site schedule. Installation supervision available Canada-wide.
What you receive
- ✓Redline markups on the full millwork drawing set
- ✓Millwork-only constructability memo (buildability, code, finish, hardware)
- ✓Coordination-gap register: MEP rough-ins, AV blocking, security cabling, structural backing for feature walls
- ✓Veneer sequence and grain-match constructability check
- ✓Hardware schedule clash report (hinge / slide / lock clearances in tight casework)
- ✓ADA/AODA reach-range verification for reception desks and public millwork
Quality & QA
Our commitments
- AWMAC GIS third-party inspection available on request
- ISO 9001-aligned quality management
- Dimensional tolerances per NAAWS 4.0 grade (Custom or Premium)
- Finish sheen, colour and film-build verified against approved sample
Gallery




FAQs
Do you review trades other than millwork?+
No — we review only the architectural millwork package. That single-trade focus is why we catch the veneer, hardware, finish and assembly issues a general constructability review misses.
When should the review happen?+
Pre-tender is ideal — we redline the millwork set before the GC prices it, so there are no surprises at award. We can also review at 50% CDs if you need early risk identification.
What does the coordination-gap register cover?+
It lists every instance where the millwork drawing set is missing blocking, MEP rough-in, AV/security cabling, or structural backing required for installation — with reference drawing numbers and proposed fixes.
Next step
Have drawings for a millwork constructability review package?
Send us the set and finish schedule — we'll return a line-item quote within one business day.