Pharmacy & Clinic Millwork
← All Services

Dispensary, exam and consultation-room casework.

Pharmacy & Clinic Millwork

Pharmacy dispensary, consultation-room and clinic casework — locked narcotics storage, cleanable substrates, integrated point-of-sale and USP <797>/<800>-aware compounding rooms.

Overview

Pharmacy and clinic environments combine retail-grade FOH with clinical-grade BOH. We engineer both sides of the counter in one drawing package, coordinated with your automation (Kirby Lester, ScriptPro) and refrigeration equipment.

For compounding rooms we build cleanable, non-shedding, coved-base casework and can integrate directly with USP <797>/<800>-compliant hood installations.

Best for

  • Community pharmacy fit-outs and re-brands
  • Medical and dental clinic buildouts
  • Walk-in / urgent-care clinics
  • Independent physician offices

Standards we build to

Every service line is engineered against the same commercial code and standards framework — the two lists below are what we routinely reference on Canadian and US projects.

🇨🇦

Canadian standards

  • AWMAC North American Architectural Woodwork Standards (NAAWS 4.0) — Economy, Custom, or Premium grade
  • AWMAC Guarantee & Inspection Service (GIS) — third-party inspected on request
  • CAN/ULC-S102 & S102.2 — surface burning characteristics (Class A available)
  • National Building Code of Canada (NBC) & Ontario Building Code (OBC) millwork provisions
  • CSA B651 & AODA — accessibility for public and workplace millwork
  • CAN/CSA O121, O151, O153 — Canadian plywood standards
  • NAPRA / provincial college of pharmacists design guidance
  • CSA Z317.13 IPAC construction requirements
🇺🇸

US standards

  • AWI Architectural Woodwork Standards (equivalent grading to NAAWS 4.0)
  • ANSI/BHMA A156 series — commercial cabinet hardware grades 1/2/3
  • ASTM E84 — surface burning (Class A/B/C flame-spread and smoke-developed)
  • CARB Phase 2 & US EPA TSCA Title VI — formaldehyde-compliant panels (NAF/NAUF available)
  • ANSI A208.1 (particleboard) & ANSI A208.2 (MDF) — panel performance grades
  • HPVA HP-1 — hardwood & decorative plywood
  • ADA 2010 Standards for Accessible Design
  • International Building Code (IBC) millwork & interior finish provisions
  • USP <797> Sterile Compounding
  • USP <800> Hazardous Drug Handling
  • State Board of Pharmacy design guidelines

Materials & finishes

Materials

  • HPL / CRL faces
  • Solid-surface counters (integral bowl)
  • Sealed cores and edges
  • Locking narcotic drawers with CompX Chicago locks

Finish systems

  • HPL brand colours
  • Solid-surface seamless

Hardware

What we specify

  • Grade 1 locks and pulls
  • Full-extension slides on all narcotic drawers

Process — award to install

  1. 01 · Estimating

    Take-off from your drawings, specs and finish schedule. Line-item quote returned within one business day for most packages.

  2. 02 · Engineering & Shop Drawings

    In-house team produces AWI/AWMAC-compliant shop drawings in AutoCAD, coordinated with Microvellum for direct-to-machine output.

  3. 03 · Submittals & Samples

    Finish samples, hardware cut-sheets and drawing set submitted for architect/GC approval prior to release to production.

  4. 04 · CNC Fabrication

    Panels nested and machined on multi-axis CNC. Solid-wood machining, edge-banding and dowel/confirmat assembly in dedicated cells.

  5. 05 · Finishing

    Controlled-environment spray booths for stain, lacquer, conversion varnish, catalyzed polyurethane and low-VOC waterborne systems.

  6. 06 · QC & Pre-Ship

    100 % dimensional and finish inspection against the approved shop drawings. Pre-assembled where practical for site-fit certainty.

  7. 07 · Delivery & Install Coordination

    Blanket-wrapped, phased delivery coordinated with your site schedule. Installation supervision available Canada-wide.

What you receive

  • Fixed-price line-item proposal with alternates
  • AWMAC/AWI-compliant shop drawings (PDF + DWG)
  • Physical finish samples & hardware cut-sheets
  • Material substitution and value-engineering log
  • Submittal package for LEED / WELL documentation
  • O&M manual and care/warranty documentation at closeout

Lead time

Budget quote1 business day
Firm quote (with drawings)3–5 business days
Shop drawings2–3 weeks post-award
Production6–10 weeks after approvals
Delivery windowPhased to site schedule

Quality & QA

Our commitments

  • AWMAC GIS third-party inspection available on request
  • ISO 9001-aligned quality management
  • Dimensional tolerances per NAAWS 4.0 grade (Custom or Premium)
  • Finish sheen, colour and film-build verified against approved sample

Sustainability & certifications

Certifications & credits

  • CARB Phase 2 / TSCA Title VI compliant panels standard; NAF/NAUF available on request
  • FSC® Chain-of-Custody material available (CoC certificate on request)
  • Low-VOC waterborne and GREENGUARD Gold finish systems available
  • Supports LEED v4/v4.1 credits: MR (Sourcing of Raw Materials, EPDs, HPDs) and EQ (Low-Emitting Materials)
  • Aligns with WELL Building Standard v2 X07 Materials Restrictions

FAQs

Do you integrate pharmacy automation?+

Yes — we coordinate cutouts, ventilation and cabling for Kirby Lester, ScriptPro and Parata systems.

Can you work under a live-store renovation?+

Yes — night and weekend crews with dust barriers and phased hand-over.

Next step

Have drawings for a pharmacy & clinic millwork package?

Send us the set and finish schedule — we'll return a line-item quote within one business day.

Request a QuoteSee our workCA · US